# Runway plan, 2027: the sweep
Runway plan, 2027: the sweep
This is the model used in chapter 31 of [the VisiMark tutorial](tutorial.md): the runway plan of chapters 29 and 30, with two of its assumptions declared as ranges to sweep and a sheet of readings for `visimark simulate`. Every number below that follows from another number is written by `visimark fmt`.
This is the model used in chapter 31 of the VisiMark tutorial:
the runway plan of chapters 29 and 30, with two of its assumptions declared as
ranges to sweep and a sheet of readings for visimark simulate. Every number
below that follows from another number is written by visimark fmt.
## Team
Team
| Team | Heads | Salary | Cost | |-------------|------:|---------:|---------:| | Engineering | 6 | 11000.00 | 67980.00 | | Sales | 3 | 9000.00 | 27810.00 | | Operations | 2 | 7500.00 | 15450.00 |
| Team | Heads | Salary | Cost |
|---|---|---|---|
| Engineering | 6 | 11000.00 | 67980.00 |
| Sales | 3 | 9000.00 | 27810.00 |
| Operations | 2 | 7500.00 | 15450.00 |
```vmark #team param raise precision 3 in [0%, 6%] lattice 2% = default 3% Cost = ROUND(Heads * Salary * (1 + raise), 2) headcount = SUM(Heads) payroll = SUM(Cost) ```
param raise precision 3 in [0%, 6%] lattice 2% = default 3%
Cost = ROUND(Heads * Salary * (1 + raise), 2)
headcount = SUM(Heads)
payroll = SUM(Cost)
The team of **11**<!--vmark=team.headcount--> people costs **111240.00**<!--vmark=team.payroll--> PLN a month, after a **3.0%**<!--vmark=team.raise|percent--> raise.
The team of 11 people costs 111240.00 PLN a month, after a 3.0% raise.
## Runway
Runway
```vmark #runway param cash precision 2 = default 2000000.00 param overhead precision 2 = default 21000.00 param new_hires precision 0 integer in [0, 6] lattice 1 = default 2 param hire_cost precision 2 = default 10500.00 burn = team.payroll + overhead + new_hires * hire_cost months precision 1 = cash / burn assert months >= 12 ```
param cash precision 2 = default 2000000.00
param overhead precision 2 = default 21000.00
param new_hires precision 0 integer in [0, 6] lattice 1 = default 2
param hire_cost precision 2 = default 10500.00
burn = team.payroll + overhead + new_hires * hire_cost
months precision 1 = cash / burn
assert months >= 12
With **2**<!--vmark=runway.new_hires--> new hires the company spends **153240.00**<!--vmark=runway.burn--> PLN a month, so the cash lasts **13.1**<!--vmark=runway.months--> months. The plan requires at least twelve.
With 2 new hires the company spends 153240.00 PLN a month, so the cash lasts 13.1 months. The plan requires at least twelve.
## Sweep
Sweep
```vmark #sweep report ledger assertions broken report deltas on runway.months report gates report best scalar runway.new_hires direction max among feasible report forbidden ```
report ledger assertions broken
report deltas on runway.months
report gates
report best scalar runway.new_hires direction max among feasible
report forbidden